Foldable Crate Mould
Innovative foldable crate mould featuring living hinge technology. When empty, crates fold to 25% of original height, saving significant storage and transportation costs. Perfect for retail logistics and e-commerce.
Cycle Time
50-60 seconds
Mould Life
400,000+ shots
Material
PP
Key Features
- 75% space saving when folded
- Living hinge technology
- Quick assembly/disassembly
- High load capacity
- Durable hinge design
Technical Specifications
| Product Size | 600 x 400 x 280 mm (open) |
| Folded Height | 70 mm |
| Mould Size | Multiple moulds required |
| Steel | 718H / S136 |
| Hardness | 30-34 HRC |
| Runner System | Hot Runner |
| Ejection | Complex ejection system |
Applications
Revolutionizing Logistics Economics
Foldable crates represent the future of reusable packaging, and our moulds enable manufacturers to capitalize on this growing market.
E-commerce Logistics Revolution
A major European online grocery retailer calculated their empty crate return costs at €2.3 million annually. By switching to our foldable crate design:
- Return transport costs reduced by 65%
- Warehouse storage for empty crates reduced by 75%
- ROI achieved in 18 months
The Economics of Space
Traditional crates occupy the same volume whether full or empty. Our foldable design transforms logistics:
| Metric | Fixed Crate | Foldable Crate |
|---|---|---|
| Empty height | 280mm | 70mm |
| Truck return capacity | 1x | 4x |
| Warehouse footprint (empty) | 1x | 0.25x |
Living Hinge Technology
The key to foldable crate durability is the living hinge. Our design survives 10,000+ fold cycles through:
- Optimized hinge geometry
- Material flow control during molding
- Precise temperature management
Living Hinge Engineering: The Critical Success Factor
Understanding Living Hinge Failure
Living hinges fail through:
- Molecular chain scission: Repeated bending breaks polymer chains
- Stress whitening: Visible as white lines at hinge
- Crack propagation: Final failure mode
Our Hinge Design Philosophy
We've developed proprietary hinge geometry that extends life by 3x:
Hinge Dimensions
| Parameter | Industry Standard | Our Design |
|---|---|---|
| Thickness | 0.5-0.6mm | 0.35-0.4mm |
| Width | 8-10mm | 12-15mm |
| Radius | Sharp | 0.3mm radius |
- More uniform molecular orientation
- Reduced stress concentration
- Better heat dissipation
Mould Engineering for Foldable Crates
Foldable crates require multiple moulds:
- Base mould: Bottom panel with hinge areas
- Side wall moulds: Four side panels
- Corner lock moulds: Locking mechanism
Assembly-Ready Production
Unlike some competitors, our moulded components are ready for assembly with:- Pre-formed hinge creases
- Self-locating corner features
- Snap-fit assembly (no hardware needed)
Cycle Time Breakdown
| Component | Cycle Time | Cavities | Hourly Output |
|---|---|---|---|
| Base | 55s | 1 | 65/hour |
| Side wall | 35s | 2 | 200/hour |
| Corner lock | 15s | 8 | 1920/hour |
Why Choose Our Foldable Crate Mould
75% space reduction when folded
10,000+ fold cycle living hinge guarantee
No-hardware snap-fit assembly
Complete mould package with guaranteed compatibility
Frequently Asked Questions
Common questions about our Foldable Crate Mould
How many fold cycles can your foldable crates survive?
Our living hinge design is tested to 10,000+ fold cycles, equivalent to daily folding for over 27 years. In accelerated aging tests, hinges maintained 80% of initial strength at 10,000 cycles.
What is the space saving when crates are folded?
Folded crates are 75% smaller than open crates. Standard dimensions: 600x400x280mm open, 600x400x70mm folded. This means 4x more crates per return truck and 75% less warehouse space for empty crate storage.
Can the foldable crate support the same loads as fixed crates?
Yes, when open and locked, our foldable crates support 25kg internal load and 100kg stacking load (4-high). The corner locking mechanism creates a rigid structure equivalent to one-piece crates.
How many moulds are needed for the complete foldable crate?
The complete package includes 4 moulds: base panel, long side wall (2-cavity), short side wall (2-cavity), and corner lock mechanism (8-cavity). We offer this as a package with guaranteed dimensional compatibility.
Is PP or HDPE better for foldable crates?
PP is strongly recommended for foldable crates due to its superior living hinge properties. PP's molecular structure allows repeated flexing without fatigue. HDPE hinges typically fail within 1,000 cycles.