Shopping Basket Mould
Professional shopping basket mould designed for retail environments. Features reinforced handles and optimal capacity for convenient shopping. The mould produces baskets with excellent load-bearing capacity and attractive appearance that enhances store branding.
Cycle Time
35-40 seconds
Mould Life
500,000+ shots
Material
PP / HDPE
Key Features
- Double folding handles
- High load capacity (25kg+)
- Logo customization area
- Smooth interior surface
- Stackable when empty
Technical Specifications
| Product Size | 480 x 320 x 280 mm |
| Mould Size | 750 x 600 x 550 mm |
| Cavity | 1 cavity |
| Steel | P20 / 718H |
| Hardness | 28-32 HRC |
| Runner System | Hot Runner |
| Ejection | Hydraulic Cylinder |
Applications
Transforming Retail Experiences Worldwide
Our shopping basket moulds power retail operations from European hypermarkets to African supermarket chains, helping brands create memorable shopping experiences.
European Retailer Partnership
In 2021, a leading German discount retailer needed to update their shopping basket fleet across 3,000 stores. Their requirements were demanding:
- Baskets must survive 5+ years of daily abuse
- Handle mechanism must withstand 200,000+ fold cycles
- Custom brand colors must match exactly (Pantone precision)
The Economics of Quality
Many retailers learn the hard way that cheap baskets cost more in the long run:
- Replacement costs: Low-quality baskets need replacement every 2 years
- Customer perception: Broken baskets reflect poorly on brand image
- Safety liability: Failed handles can cause customer injuries
Customization for Brand Identity
The shopping basket is often the first touchpoint between customer and store. We offer:
- Exact color matching: Pantone or RAL color codes
- Logo integration: Molded-in logos that never fade
- Unique handle colors: Two-shot molding for contrast handles
Handle Engineering: The Heart of Shopping Basket Design
The double-folding handle is the most critical component of shopping basket design, and where most competitors fail.
The Challenge of Handle Durability
Standard shopping basket handles fail through a predictable pattern:
- Living hinge fatigue (most common)
- Handle attachment point stress cracking
- Grip area erosion from customer use
Our Proprietary Handle Solution
We developed a three-component handle system that addresses each failure mode:
1. Optimized Living Hinge Geometry
| Parameter | Standard Design | Our Design |
|---|---|---|
| Hinge Thickness | 0.6mm | 0.4mm |
| Hinge Width | 15mm | 22mm |
| Pre-stress Angle | 0° | 15° |
| Fold Cycles | 50,000 | 200,000+ |
2. Reinforced Attachment Points
We use a boss-and-rib system at handle attachment points:
- 4mm wall thickness at stress concentration zones
- Gusset ribs distribute load over larger area
- Radius corners eliminate stress risers
3. Textured Grip Surface
The handle grip features:
- 0.5mm deep texture pattern for comfortable grip
- Slightly raised edges prevent hand slipping
- Smooth underside for easy cleaning
Load Capacity Engineering
Our 25kg capacity rating is based on:
- Static load: 35kg (safety factor 1.4x)
- Dynamic load: 20kg dropped from 300mm height
- Fatigue load: 15kg, 10,000 load cycles
Injection Parameters for Optimal Handle Formation
Critical molding parameters for handle quality:
- Melt temperature: 230-240°C (PP)
- Injection speed: Medium-fast for hinge area
- Hold pressure: 60% of injection pressure
- Cooling time: Extended for handle area (25 seconds)
Why Choose Our Shopping Basket Mould
200,000+ fold cycle handle mechanism - 4x industry standard
25kg load capacity with 1.4x safety factor
Custom branding area 150x80mm on each side
Pantone/RAL color matching available
Frequently Asked Questions
Common questions about our Shopping Basket Mould
How do you customize the logo area on shopping baskets?
We offer two logo integration options: 1) Engraved/debossed logos (included in base price) up to 150x80mm per side, and 2) Raised/embossed logos requiring slight core modification. For color logos, many clients use hot stamping or in-mould labeling (IML) which we can optimize the mould for.
What is the minimum order quantity for custom colors?
The mould itself accommodates any color. The minimum order for custom-colored baskets depends on your production partner, typically 5,000-10,000 pieces to justify a dedicated color run. We can refer you to production partners if needed.
Can the handle be designed for metal reinforcement?
Yes, we offer a metal-insert handle variant where a steel wire runs through the handle grip. This increases capacity to 35kg and is popular for industrial/wholesale applications. The mould includes insert positioning features.
How does your basket handle compare to competitors?
We've tested 12 competitor baskets. Key differences: Our hinge survives 200,000+ folds vs. industry average of 50,000. Our 25kg capacity exceeds the typical 15-20kg rating. Our grip texture scores 4.2/5 in user comfort studies vs. 3.1/5 average.
What basket sizes are available from this mould design?
Our standard design is 480x320x280mm (approximately 35 liters). We can scale the design to 28-liter or 45-liter variants with proportional mould modifications. The handle mechanism scales appropriately.