RFP Objective and Business Context
Establish procurement requirements for a PC stackable-crate mold serving retail distribution networks. Stackable crates demand modular cavity architecture with synchronized cooling to manage PC's 280β320Β°C melt window and extended cycle times inherent to heavy-walled sections (2.5β4 mm nominal). Define cavity count, nesting geometry, and ejection sequencing to support automated handling via air ejection or cam-operated suction-cup systems. Specify material qualification to PC grade meeting food-contact or chemical-resistance criteria where applicable. Establish mold class (typically A or B for high-volume retail), machine compatibility (stack-capable injection units), and production volume targets to justify modular construction complexity and amortization strategy.