Baseline Definition and Benchmark Scope
PC stackable-crate molds in Southeast Asia are defined by wall thickness 2.0β3.5 mm, cavity count 4β8 per stack, and modular center-section construction for air ejection and cam-operated removal systems. PC's 1.20 g/cmΒ³ density and 2.3 GPa flexural modulus ensure structural rigidity under stacking loads; optical clarity enables logo/barcode visibility. Baseline scope covers single-cavity production volumes 500kβ2M units annually, mold steel (P20/NAK80), and standard hot-runner systems. Shrinkage tolerance Β±0.3% is critical for nesting fit. Cycle times baseline 45β65 seconds per shot on 200β280-ton machines. Regional scope includes Vietnam, Thailand, and Malaysia suppliers with ISO 13485 or equivalent certifications.