RFP Objective and Business Context
Procure a single-source PC stackable-crate mold for retail logistics applications requiring outdoor UV and chemical durability. PC's high-impact strength and optical clarity support transparent or translucent crate designs with wall thickness 2β3.5 mm for stacking loads. Mold architecture must employ modular stack-mold construction with floating center section and cam-operated actuators for multi-cavity ejection into side chutes. Cooling time requirements reflect PC's melt temperature window (280β320Β°C) and density (1.20 g/cmΒ³). Supplier must demonstrate experience with long-cycle, heavy-walled container stack molds and provide thermal-management design for equivalent cooling across all cavities.