RFP Objective and Business Context
Procure injection mold tooling for polycarbonate outdoor food-beverage crates with sample-first production gate. Define mold class (typically Class 101β102 for high-volume logistics), cavity count, and cycle time targets. PC's 1.20 g/cmΒ³ density and 2.3 GPa flexural modulus deliver load-bearing strength for stacked crates; however, poor chemical resistance to solvents mandates UV-stabilized resin and protective surface treatments. Establish baseline part geometry, wall thickness range (1.5β4 mm), gate location (center gate preferred for L/t β€200), and cooling circuit requirements. Supplier must demonstrate mold-filling simulation capability and outdoor-grade material qualification before sample approval.