RFP Objective and Business Context
Procure a high-cavitation PE cold-chain crate mold capable of producing food-grade logistics containers with sample-first validation. PE resin (density 0.94–0.97 g/cm³, melt 180–230°C) provides superior chemical resistance and flexibility for stacking loads, but requires tight shrinkage control (2.0–3.0%) to maintain dimensional stack-nesting tolerances. Define cavity count, part geometry (typical wall 2–5 mm), and production volume ramp. Specify cooling-line layout for cycle-time optimization—PE's lower thermal conductivity demands robust water management. Establish mold class (A/B) and whether supplier provides first-article inspection (FAI) samples before full-cavity production release.