Baseline Definition and Benchmark Scope
PE cold-chain crate molds are standardized for 2–5 mm wall thickness, optimized for PE's 2.0–3.0% shrinkage and 0.94–0.97 g/cm³ density. Baseline scope covers 4–8 cavity molds with straight-line cooling systems (O-ring fittings, 0.05–0.2 cost coefficient per cavity). African sourcing baseline: mold cost $8,500–$15,200 USD, material cost per part $0.08–$0.14 USD (accounting for PE density and 28–45 g part weight). Cycle time baseline 45–65 seconds per shot. This benchmark applies to standard stackable crate geometries without valve gates or hot-runner complexity. Regional lead-time norm: 10–14 weeks from order to first article inspection.