Guide Content
Operational framework for procurement execution
RFP Objective and Business Context
Procure a single-cavity PC basket mold for high-volume consumer goods production. PC material selection demands melt temperature control (280–320°C) and shrinkage compensation (0.5–0.7%) to maintain dimensional accuracy and optical clarity. Single-cavity design permits edge-gating without compromise, critical for aesthetic basket applications where center gates create visible marks. Define annual volume, part weight, wall thickness range (1.5–4 mm typical for baskets), and required cycle time. Establish mold life expectancy (cavity count), material grade specification (virgin vs. regrind tolerance), and delivery timeline. Single-source procurement reduces tooling risk and simplifies design iteration.
Specification Completeness and Traceability
Specify PC resin grade with flexural modulus minimum 2.3 GPa and density 1.20 g/cm³ verification. Define wall thickness range (1.5–4 mm) with shrinkage allowance tables for PC's 0.5–0.7% range across gate location, wall section, and cooling time. Mandate gating system design: gate location, gate size, runner diameter, and hot-runner offset configuration if edge-gating is required. Detail cooling channel layout, water temperature setpoint, and thermal simulation results (Moldflow or equivalent) validating uniform cavity fill and ejection temperature <110°C. Specify parting line position, ejector pin count and diameter, and draft angles. Require CAD model delivery (STEP format) with tolerance stack-up documentation. Include chemical resistance limitations: PC resists water and weak acids but degrades with organic solvents—specify approved mold release agents.
Commercial Terms and Cost Transparency
Request itemized tooling cost breakdown: cavity design, gating/cooling system, ejector mechanism, and assembly labor. Separate mold base cost from cavity insert cost to enable future cavity replacement without full mold rebuild. Define payment schedule: 30% upon order, 50% at first article inspection (FAI), 20% at delivery. Establish per-shot material cost baseline (PC resin cost + processing scrap allowance) and clarify who absorbs first-run scrap. Include mold maintenance pricing: cavity polishing, ejector pin replacement, and thermal imaging diagnostics. For single-cavity design, negotiate cavity life warranty (minimum 500k shots) with cost-per-shot escalation after threshold. Specify tool storage and climate control responsibility if mold remains with supplier post-launch.
Validation Deliverables and Acceptance Criteria
Require first-article inspection (FAI) report including: cavity dimensional check (±0.05 mm on critical features), surface finish verification (Ra ≤0.8 µm on cosmetic surfaces), and cooling system pressure/temperature mapping under production conditions. Mandate 100-shot trial run with PC resin at 280–320°C melt temperature, validating shrinkage compensation and part ejection temperature. Accept parts only if dimensional variance is ≤0.3% (within PC's 0.5–0.7% shrinkage tolerance) and surface finish meets cosmetic grade. Require thermal imaging to confirm no hot spots exceeding 115°C. Supplier must document gate vestige height, parting line flash, and ejection force. Deliver mold documentation: design drawings, cooling/heating schematics, maintenance log template, and recommended resin suppliers with processing windows.
Risk Transfer, Warranty, and Service Terms
Supplier warrants cavity dimensional accuracy (±0.05 mm) for first 100k shots; buyer assumes wear liability thereafter. Supplier covers defects in gating/cooling system design for 12 months post-delivery. Establish escalation protocol: if cavity wear exceeds 0.1 mm within 250k shots, supplier refunds 25% of cavity insert cost. Buyer assumes responsibility for PC resin quality control and machine parameter maintenance. Supplier provides on-site troubleshooting support (4 hours, travel cost separate) within 30 days of delivery. Specify mold insurance: supplier maintains coverage until delivery; buyer insures in-house. Include force majeure clause excluding liability for supply chain delays >90 days. Define intellectual property: buyer owns part design; supplier retains mold design documentation with 2-year non-compete clause.
Award Process and Transition Governance
Evaluate suppliers on three gates: (1) Technical—CAD review, thermal simulation validation, and PC processing expertise; (2) Commercial—tooling cost, payment terms, and warranty scope; (3) Operational—FAI turnaround time (<4 weeks), cavity life guarantee, and post-launch support availability. Weight technical 50%, commercial 30%, operational 20%. Request references from prior PC basket mold projects. Conduct virtual design review with supplier engineering; require sign-off on gating, cooling, and shrinkage compensation before mold steel order. Establish kick-off meeting post-award: confirm resin supplier compatibility, machine specifications, and FAI schedule. Designate single point of contact for design changes. Schedule FAI within 6 weeks of award; condition final payment on acceptance. Plan knowledge transfer: supplier trains internal team on cavity maintenance, thermal diagnostics, and resin changeover procedures.