Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity basket molds for outdoor logistics applications molded in PC (polycarbonate). Scope includes wall thicknesses 1.5–4 mm, typical shot weights 200–800 g, and mold bases rated for 500,000–2,000,000 cycles. PC's 1.20 g/cm³ density and 2.3 GPa flexural modulus support load-bearing basket structures. Baseline accounts for PC's poor solvent resistance and superior impact strength—critical for outdoor handling. Benchmarks reflect North American labor, electricity ($.02–$.15/kWh regional variance), and tooling lead times. Quality targets include dimensional tolerance ±0.3–0.5 mm, optical clarity (haze <3%), and surface finish Ra 1.6–3.2 µm for food-grade logistics containers.