System Boundary and Scope Definition
PP crate mold integration spans material specification (virgin PP with UV stabilizer package), mold cavity design (1.5–4 mm wall tolerance ±0.1 mm), and logistics performance gates. Define shrinkage compensation at 1.5–2.0% across gate location, rib geometry, and handle attachment points. Establish thermal boundary: melt temp 220–280°C with ±5°C control to prevent degradation and dimensional creep. Scope includes mold cooling circuit design (target 40–50°C mold temp to minimize cycle time while respecting PP's low thermal conductivity), material traceability from resin supplier through injection processor, and final dimensional/stacking-load verification before first production run. Exclude secondary operations unless specified in product design.