System Boundary and Scope Definition
PP crate mold lifecycle cost encompasses material cost, mold investment, cycle time, and post-molding logistics. For a 40 g PP crate at $1.00/kg, material cost is $0.04 per unit; total part cost integrates mold amortization across cavity count and production volume. Scope includes design phase (wall thickness 1.5β4 mm optimization), molding window (220β280Β°C melt temperature management), and logistics operations (density 0.90 g/cmΒ³ affects stacking and transport). Shrinkage tolerance (1.5β2.0%) directly impacts gate location, core/cavity dimensioning, and crate stackability in returnable systems. Exclude post-molding decoration and UV stabilizer costs; include mold maintenance and material yield (typically 95%) in annual cost models.