System Boundary and Scope Definition
PC chair-mold lifecycle cost encompasses mold design validation, cavity pressure mapping (280–320°C melt window), and post-mold shrinkage compensation across 1.5–4 mm wall sections. Define scope to include: (1) thermal profiling at nozzle, runner, cavity entry; (2) holding-pressure curves indexed to cavity fill time; (3) demold temperature windows preventing stress-whitening in optical zones; (4) food-contact material certification handoff to compliance teams. Exclude secondary operations and assembly integration. Establish baseline part weight, dimensional tolerance stack (±0.1–0.2 mm typical for PC), and optical clarity acceptance criteria. Cross-functional scope includes mold supplier, process engineer, quality, and regulatory—each with defined entry/exit criteria at design review, trial run, and production launch phases.