System Boundary and Scope Definition
Define mold scope for PC agricultural chairs by establishing cavity count, wall thickness (1.5β4 mm typical), and shrinkage compensation targets (0.5β0.7% baseline). Agricultural chairs experience UV and chemical exposure; PC's optical clarity advantage becomes liability if stress concentrations trigger crazing under outdoor conditions. System boundary includes raw material specification (virgin vs. regrind ratio), mold steel selection (corrosion resistance for humid environments), cooling circuit design to maintain melt at 280β320Β°C uniformly, and ejection strategy to prevent gate-induced stress. Scope excludes post-mold finishing but includes dimensional validation gates at cavity level. Establish baseline shrinkage maps using CAE flow analysis to predict cavity-to-cavity variation before tooling investment.