System Boundary and Scope Definition
PC basket-mold scope encompasses material specification, mold cavity design tolerances, and process parameter windows. PC's 0.5–0.7% shrinkage directly drives cavity oversize calculations; undersizing causes dimensional failure, oversizing creates flash and secondary operations. Define boundary at raw material receipt through finished-part inspection. Include mold steel hardness (50–52 HRC minimum) to withstand PC's 280–320°C melt without galling. Establish wall thickness limits (1.5–4 mm typical) to prevent warping and optical distortion. Cross-functional handoff points: material certification to tooling design, mold commissioning to production release, and lot-to-lot supplier verification to quality gates.