System Boundary and Scope Definition
HDPE storage mold tooling scope encompasses raw material receipt through finished part logistics. Define boundaries: material specification (density 0.94–0.97 g/cm³, melt flow index range), mold design constraints (wall thickness 2–5 mm typical for storage containers), and process parameter windows (melt temperature 180–230°C, cooling time dependent on wall thickness). Establish shrinkage compensation strategy (2.0–3.0% HDPE linear shrinkage) integrated into mold cavity design. Include storage conditions: FIFO inventory management, natural ventilation warehousing, and silo storage protocols for bulk purchases. Define cross-functional touchpoints: procurement approval, tool engineering sign-off, process validation, and logistics coordination. Exclude secondary operations and post-mold finishing unless critical to storage function.