System Boundary and Scope Definition
HDPE basket-mold integration spans material specification (density 0.94β0.97 g/cmΒ³, flexural modulus 0.8β1.5 GPa), mold design (cavity pressure, cooling channels, gate location), and logistics operations (warehouse stacking, handling, transport). Define scope boundaries: resin grade selection, wall thickness (2β5 mm typical), shrinkage compensation (2.0β3.0%), and cooling-time requirements affect both cycle time and warehouse logistics readiness. Establish cross-functional ownership: procurement owns supplier qualification; engineering owns mold thermal design; operations owns fill-rate and inventory turnover. Exclude secondary finishing and decoration unless specified. Lock material specs before tooling investment to prevent logistics delays from rework.