System Boundary and Scope Definition
Define scope across three integration layers: (1) Mold design—HDPE's 2.0–3.0% shrinkage requires cavity compensation and cooling-time prediction tied to wall thickness (2–5 mm typical); (2) Supplier operations—melt-temperature control (180–230°C) and cycle-time stability directly impact logistics buffer stock; (3) Logistics network—HDPE's density (0.94–0.97 g/cm³) and linear structure enable high-speed stacking and long-term storage without crystallinity drift. Scorecard must capture tooling lead time (8–14 weeks), mold-maintenance intervals, and supplier's ability to hold tight shrinkage windows across production batches. Exclude post-mold finishing unless supplier owns secondary operations.