System Boundary and Scope Definition
HDPE household-mold integration spans material procurement, mold design validation, process parameter lock, and logistics staging. System boundary includes resin supplier qualification (density 0.94–0.97 g/cm³, melt flow index verification), mold builder tooling specs (wall thickness 2–5 mm, cavity pressure mapping), and molding facility process window (180–230°C melt temp, cooling time optimization). HDPE's linear structure and excellent chemical resistance eliminate branch-chain complications but require strict shrinkage compensation (2.0–3.0%) in cavity design. Cross-functional handoffs include material data sheet review, mold thermal simulation approval, first-article inspection (FAI) protocols, and logistics buffer-stock positioning. Scope excludes post-mold finishing unless specified in design intent.