System Boundary and Scope Definition
ABS storage mold scope encompasses cavity design for 1.5β3 mm walls, runner systems sized for 220β260Β°C melt viscosity, and cooling circuit layout to manage shrinkage (0.4β0.7%) uniformly across agricultural container geometries. Define mold material grade (tool steel P20 or H13), ejection pin placement, and gate location to minimize weld lines in high-stress zones. Establish density tolerance window (1.03β1.06 g/cmΒ³) and flexural modulus targets (2.1β2.8 GPa) for structural integrity under field loading. Clarify part volume, cavity count, and production run length to determine whether family tooling or dedicated molds optimize cost and lead time.