System Boundary and Scope Definition
ABS basket mold lifecycle cost encompasses mold fabrication investment, machine allocation, material throughput, and regrind recovery. For agricultural baskets (typical wall 2–2.5 mm), define scope boundaries: mold cavity count (single vs. multi-cavity), shot weight (typically 400–800 g per part), and annual volume targets. ABS shrinkage of 0.4–0.7% directly affects cavity sizing and tolerance stack-up on agricultural fitment features. Establish baseline cycle time at melt temperature 230–245°C and cooling time requirements. Include sprue/runner material cost (15–25% of shot weight) and regrind proportioning strategy. Separate fixed tooling costs from variable molding labor, utilities, and material consumption. Agricultural applications require chemical resistance verification against fertilizer residues; ABS's moderate chemical resistance sets material qualification boundaries.