System Boundary and Scope Definition
Define the ABS basket mold scope to encompass cavity geometry (wall thickness 1.5–3 mm), runner layout, gate locations, and thermal zones governing the 220–260°C melt window. Establish baseline shrinkage targets (0.4–0.7%) tied to final basket dimensions and nesting geometry. Include regrind feed specifications: maximum regrind percentage (typically ≤50% virgin blend to preserve elongation above 50%) and sprue-to-shot weight ratios for immediate recycle equilibrium. Map cross-functional handoffs: mold maker → process engineering (thermal profiling) → quality (dimensional sampling) → logistics (packing, storage, transport conditions). Specify supplier deliverables: mold prints with shrinkage callouts, process window documentation, regrind procedure sheets, and first-article inspection (FAI) reports validating gate balance and part uniformity.