Decision Context and Winning Criteria
Choose PP when chemical resistance and dimensional stability are critical. PP's 1.5β2.0% shrinkage is more uniform than PE-HD, reducing warping in large crate geometries. PP's flexural modulus (1.1β1.6 GPa) delivers superior stiffness for stacked loads without thickening walls beyond 1.5β4 mm. PE excels in impact toughness and lower melt-processing temperatures (110β150Β°C), reducing cycle time and energy cost. Select PE for applications requiring flexibility, damping, or high-speed production. PP's excellent acid/base resistance suits aggressive cleaning protocols in food facilities; PE tolerates oils and fats better. Cost-per-part typically favors PE on high-volume runs due to faster cycles, but PP's lower shrinkage reduces scrap and rework.