Decision Context and Winning Criteria
PE crate molds prioritize impact absorption and chemical resistance; PP molds emphasize structural rigidity and dimensional precision. PE's flexural modulus of 0.6β1.4 GPa suits flexible, stackable crate designs absorbing shock during transport and handling. PP's superior stiffness (5β14 GPa) supports rigid, load-bearing structures where deflection must stay under 1β2 mm. Choose PE when crates transport chemicals, detergents, or corrosive liquids; the material's excellent chemical resistance prevents degradation. Select PP when crates demand high compressive strength, nested stacking without deformation, or operating temperatures above 100Β°C. Cost baseline: PE typically runs 8β15% lower material cost, but PP's lower shrinkage (1.8β2.5% vs PE's 2.0β3.0%) reduces mold cavity count and tooling complexity, offsetting raw material savings.