Decision Context and Winning Criteria
PP melts at 220–280°C with shrinkage of 1.5–2.0%, delivering excellent acid and base resistance critical for agricultural chemicals. PE melts lower (190–210°C) but exhibits higher shrinkage variance and superior low-temperature impact strength. Choose PP when crates store fertilizers, herbicides, or corrosive liquids requiring chemical stability and lightweight design (0.90 g/cm³ density). Choose PE when impact durability during rough field handling and lower tooling costs outweigh chemical exposure. PP's uniform shrinkage reduces dimensional variance across production runs, improving stack-fit tolerances. PE's toughness mitigates cracking from dropped loads or thermal shock. Procurement must balance chemical environment, handling abuse, wall thickness (PP typical 1.5–4 mm), and unit economics across 50,000+ annual units.