Decision Context and Winning Criteria
PE's 180β230Β°C melt window and 0.94β0.97 g/cmΒ³ density create cost advantages in high-volume logistics molds, but its 2.0β3.0% shrinkage requires tighter cavity compensation. PP's 1.8β2.5% shrinkage uniformity reduces dimensional variation across production runs, critical for stackable crates and nested containers. PE excels where impact absorption and chemical resistance (detergents, oils, UV) dominate; PP wins when wall stiffness (flexural modulus 5β14 GPa) and tight tolerance logistics require minimal post-mold rework. Evaluate mold cooling time: PE's lower viscosity sensitivity accelerates cycle time vs. PP's temperature-dependent flow. Choose PE for flexible outdoor bins; select PP for rigid transport trays where dimensional consistency prevents logistical fit failures.