Decision Context and Winning Criteria
Logistics chair-mold selection hinges on load-bearing requirements, chemical exposure, and cost sensitivity. PE excels when chairs contact oils, solvents, or corrosive warehouse environments due to excellent chemical resistance; its 2.0–3.0% shrinkage and 0.6–1.4 GPa flexural modulus suit flexible, impact-resistant designs with wall thicknesses of 2–5 mm. PP wins when stiffness and dimensional precision dominate—rigid armrests, seat frames, and structural ribs demand PP's higher modulus and lower shrinkage variability. Choose PE when impact absorption and chemical durability outweigh stiffness; choose PP when cost-per-unit and structural rigidity are non-negotiable. Define acceptance gates around mold cavity pressure, cooling-time targets, and part deflection under 100 kg static load.