Decision Context and Winning Criteria
PE-vs-PP selection for basket molds hinges on end-use performance and cost targets. PE (melt temp 180–230°C, shrinkage 2.0–3.0%) excels in chemical resistance and impact absorption—critical for food-contact and outdoor baskets. PP offers superior stiffness and creep resistance, favoring structural load-bearing designs. Choose PE when: flexibility, chemical exposure, or wall thickness 2–5 mm with soft-touch finish drives value. Choose PP when: rigid sidewalls, higher operating temperatures (100°C+), or high-volume cost reduction justifies tooling investment. Baseline wall thickness tolerance, draft angles, and gate location differ significantly; PE tolerates thinner walls (2–3 mm) without gate blush, while PP requires 3–5 mm for equivalent stiffness.