Decision Context and Winning Criteria
PE vs PP selection hinges on stiffness tolerance and chemical exposure. PE's flexural modulus (0.6β1.4 GPa) suits flexible, impact-resistant baskets for rough field handling; PP's superior rigidity (1.5β2.0 GPa) prevents deformation under stacked loads. PE excels where soil acids, fertilizer residues, or pesticide contact demands chemical resistance. PP wins when dimensional stability and load-bearing stiffness are non-negotiable. For outdoor agriculture, UV stabilizer packages differ: PE requires carbon black or hindered-amine additives; PP tolerates lower additive costs. Define wall thickness (PE typical 2β5 mm vs PP 1.5β3 mm) and stack-load requirements upfront to anchor material choice.