Decision Context and Winning Criteria
Choose PE when retail storage molds require impact absorption, flexibility, and wall thicknesses of 2–5 mm with excellent chemical resistance. PE's low flexural modulus (0.6–1.4 GPa) suits collapsible or semi-flexible containers. Select HDPE when rigidity, dimensional stability, and stiffness dominate—HDPE's higher crystallinity delivers superior load-bearing capacity for stacked retail bins. PE's shrinkage (2.0–3.0%) requires tighter mold tolerances than HDPE's lower shrinkage. Cost-wise, PE typically undercuts HDPE by 8–15% per kilogram, but HDPE's lower scrap rates offset material savings. Winning criteria: PE wins on cost and flex; HDPE wins on structural performance and production efficiency.