Decision Context and Winning Criteria
Retail chair molds demand materials balancing rigidity, impact resistance, and production cost. HDPE dominates when structural integrity is critical: its flexural modulus of 0.8–1.5 GPa and excellent low-temperature impact performance suit load-bearing frames and seat backs. Generic PE (LDPE/LLDPE) wins when flexibility and cushioning matter—armrests, bumpers, or parts absorbing shock. Choose HDPE for chairs requiring 2–5 mm wall thickness with minimal deflection under seated load. Choose PE when cost reduction and material flexibility outweigh stiffness demands. HDPE's 2.0–3.0% shrinkage requires tighter mold tolerances; PE's 1.5–4.0% range demands compensation in gate design and cooling strategy.