Decision Context and Winning Criteria
PE's melt temperature range of 180–230°C and shrinkage 2.0–3.0% suit high-volume commodity chair production where chemical resistance to food oils and beverages is critical. ABS excels when structural rigidity, surface finish quality, and dimensional precision dominate procurement priorities. Choose PE when: cost-per-unit is primary, chemical exposure is high, and wall thickness 2–5 mm is acceptable. Choose ABS when: load-bearing performance, aesthetic finish, and tight tolerances are non-negotiable. Food-beverage chairs demand chemical compatibility; PE's wax-like surface and excellent resistance to oils outperform ABS in direct food contact scenarios. ABS's superior stiffness prevents deflection under seated load but requires higher processing temperatures and tighter mold control.