Decision Context and Winning Criteria
Choose PE when agricultural chairs face prolonged chemical exposure—fertilizer runoff, pesticides, UV weathering—because PE's excellent chemical resistance and low density reduce degradation risk. PE melt temperature (180–230°C) enables faster cycle times and lower energy costs on high-volume outdoor seating. Choose ABS when structural rigidity and impact resistance dominate: ABS flexural modulus (2.0–2.5 GPa) versus PE's 0.6–1.4 GPa means thinner walls and stiffer armrests. Cost trade-off: PE resin averages 15–20% lower material cost but requires thicker walls (2–5 mm) to match ABS stiffness, offsetting savings. ABS suits indoor-only or climate-controlled storage scenarios; PE dominates field-deployed equipment.