Decision Context and Winning Criteria
Choose HDPE when outdoor products require low-temperature impact resistance and extended UV/chemical exposure—typical for storage containers, refuse bins, and poolside fixtures. HDPE's 180–230°C melt window and 2.0–3.0% shrinkage enable consistent wall thickness (2–5 mm) in large hollow parts. Select PP when stiffness, cost reduction, and faster cycle times outweigh impact demands—automotive trim, food packaging, and light-duty outdoor trays. PP's superior tensile strength and lower density (0.90–0.91 g/cm³) reduce material cost 8–12% per unit. Decision hinges on climate exposure: HDPE excels in cold climates and marine environments; PP suits temperate, high-volume retail applications where brittleness risk is acceptable.