Decision Context and Winning Criteria
Retail basket molds demand material selection based on durability, stiffness, and production cost. HDPE (0.94–0.97 g/cm³ density, 0.8–1.5 GPa flexural modulus) excels in low-temperature impact resistance and chemical compatibility, critical for cold-chain retail environments. PP achieves higher rigidity and lower resin cost but sacrifices low-temp toughness. Choose HDPE when baskets encounter sub-zero storage or require superior chemical resistance to cleaning agents and food oils. Choose PP when stiffness and cost minimization dominate, and ambient conditions remain above 0°C. Wall thickness (2–5 mm typical for HDPE) and shrinkage control (HDPE: 2.0–3.0%) directly impact mold complexity and secondary finishing.