Baseline Definition and Benchmark Scope
PE nestable basket molds in Southeast Asia are scoped for retail distribution applications with wall thickness 2.5–4.0 mm and cavity counts 2–8. PE's low stiffness (flexural modulus 0.6–1.4 GPa) necessitates ribbed internal geometry to maintain structural integrity during nesting. Mold baseline includes runner optimization for melt temperatures 180–230°C, cavity-pressure monitoring, and ejection-pin placement to prevent warping. Shrinkage benchmarks 2.0–3.0% are critical for nested-part tolerance stacks. Scope excludes multi-material inserts and gas-assist features. Regional baseline assumes standard hardened steel cavities, water cooling, and lead-time window 8–12 weeks from order to first-article delivery.