Baseline Definition and Benchmark Scope
PE nestable basket molds in Southeast Asia are defined by cavity count (4β16), nesting geometry, and PE-specific processing windows: melt temperature 180β230Β°C, shrinkage 2.0β3.0%, wall thickness 2β5 mm. Baseline scope covers tooling cost (USD 8,000β18,000 for multi-cavity molds), cycle time 45β75 seconds per shot, and regional lead-times of 10β14 weeks from order to first article. PE's low stiffness (0.6β1.4 GPa flexural modulus) requires reinforced draft angles and careful gate design to prevent part distortion during cooling. Quality baseline includes dimensional tolerance Β±0.3 mm, surface finish Ra 1.6β3.2 Β΅m, and visual defect acceptance AQL 1.0 per ANSI Z1.4.