Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PP checkout-basket molds for European retail deployment. Baseline parameters: melt temperature 220β280Β°C, wall thickness 1.5β3.5 mm, estimated cycle time 7β9 seconds per shot, stripper-ring ejection with pneumatic actuation, and center hot-tip gating. Shrinkage tolerance band 1.5β2.0% drives post-mold dimensional stability. UV-stabilizer package (carbon black or hindered-amine light stabilizer) is mandatory for outdoor/backroom storage. Mold cavity count ranges 2β8 for economic production batches. Baseline assumes ISO 1043 PP homopolymer (density 0.90 g/cmΒ³), flexural modulus 1.1β1.6 GPa. Benchmark excludes secondary operations (printing, assembly) and post-mold chrome plating, quoted separately.