Baseline Definition and Benchmark Scope
This benchmark covers single-cavity and multi-cavity PP checkout-basket molds manufactured in EU and UK facilities for retail distribution. Scope includes molds with wall thicknesses 1.5β3 mm, cavity counts 1β4, and production volumes 500Kβ2M units annually. PP's 1.5β2.0% shrinkage and 0.90 g/cmΒ³ density demand precision cooling channels and gate design to maintain dimensional tolerance Β±0.2 mm on basket rim and handle attachment points. Baseline cycle time: 6β8 seconds with stripper-ring ejection. Mold steel: P20 or equivalent hardened to 38β42 HRC. Cost baseline excludes chrome plating; cooling-water infrastructure and startup optimization are assumed standard.