Baseline Definition and Benchmark Scope
This benchmark covers injection-molded PC basket molds for outdoor retail applications across North America, targeting wall thicknesses of 1.5β3.5 mm with optical clarity and high-impact requirements. PC's flexural modulus of 2.3 GPa and shrinkage of 0.5β0.7% define mold cavity tolerances and cooling strategy. Baseline production volumes span 10,000β500,000 units annually. Mold complexity includes undercuts, snap-fit features, and drainage holes. Baseline scope excludes custom texture, multi-cavity overmolding, and secondary assembly. Regional benchmarks account for North American tool-room capacity, resin logistics, and regulatory compliance. Performance thresholds reflect typical first-article inspection (FAI) requirements and ongoing process capability (Cpk β₯1.33).