Baseline Definition and Benchmark Scope
HDPE cold-chain crate molds in the Middle East baseline at 2β5 mm wall thickness with 0.94β0.97 g/cmΒ³ density and 2.0β3.0% shrinkage compensation. Mold cavity counts range 2β8 cavities for standard crates (600Γ400Γ300 mm typical). Processing window: melt temperature 180β230Β°C, cycle time 35β60 seconds per shot. Cooling system design employs multiple small-diameter channels (14 mm maximum) to maintain uniform thermal distribution across thick-walled sections. This scope excludes hot-runner systems and covers conventional valve-gated or direct-sprue designs. Regional benchmarks account for 12β16 week lead times, local material availability, and Middle East labor cost structures.