Baseline Definition and Benchmark Scope
HDPE cold-chain crate molds for African logistics operations are defined by wall thickness 2β5 mm, cavity counts 1β8, and mold bases supporting 50β200 ton clamping force. Baseline scope covers tool costs USD 8,000β22,000 (single-cavity to 4-cavity configurations), cycle times 25β45 seconds, and shrinkage compensation 2.0β3.0% specific to HDPE's density range 0.94β0.97 g/cmΒ³. Cooling channel design (straight-line O-ring systems or hot-runner thermal gates) directly impacts lead-time and mold cost coefficients. Benchmark excludes prototype tooling and addresses production-intent molds with 500,000+ shot life expectations in sub-Saharan and North African supply chains.