Baseline Definition and Benchmark Scope
PP cold-chain crate molds in Southeast Asia are defined by wall thickness 1.5–4 mm, cavity counts 2–8, and shot weights 800–2,500 g. PP's shrinkage tolerance of 1.5–2.0% directly impacts dimensional stability in stacked crate applications. Mold cooling employs spiral or multi-channel designs; spiral cooling through the sprue section minimizes heat concentration and reduces cycle variance. Baseline scope covers single-cavity to family-mold configurations, injection pressures 60–90 MPa, and hold-pressure phases critical for preventing sink marks on thick ribs. Regional benchmarks account for Southeast Asian labor costs, material sourcing proximity, and tooling infrastructure maturity across Thailand, Vietnam, and Malaysia.