Baseline Definition and Benchmark Scope
PP checkout basket molds in Latin America are defined by cavity count (typically 4β8), wall thickness (1.5β3.0 mm for structural rigidity), and production volume (50kβ500k units annually). Benchmark scope covers mold lead-time from order to first article inspection (FAI), including PP-specific cooling circuit design for uniform shrinkage control (1.5β2.0% across all walls). Regional baseline assumes standard two-plate progressive cavity molds with side actions for handle undercuts. Quality KPIs include dimensional tolerance Β±0.1 mm on critical features, gate location optimization to minimize weld-line stress, and surface finish Ra 1.6β3.2 Β΅m. Lead-time measurement begins at PO signature and ends at mold release for production. Benchmark excludes custom cooling manifolds or advanced conformal cooling, which extend timelines by 3β6 weeks.