Decision Context and Winning Criteria
ABS vs PP selection for outdoor consumer-goods baskets hinges on three procurement dimensions: dimensional stability, stiffness requirement, and total cost. ABS excels in precision—shrinkage of 0.4–0.7% and flexural modulus of 2.1–2.8 GPa enable tight-tolerance designs without secondary finishing. PP trades dimensional precision for lower resin cost and superior chemical/UV resistance. Choose ABS when basket walls require 1.5–3 mm thickness with minimal post-mold trimming and high rigidity under load. Choose PP when outdoor exposure demands chemical inertness and cost per unit drives design economics. Baseline mold complexity, cycle time, and supplier capacity must align with material selection before tooling commitment.