Baseline Definition and Benchmark Scope
Southeast Asian PP checkout basket molds are defined by cavity count (typically 1–4 cavities), wall thickness range 1.5–3.5 mm, and production volumes 500K–5M units annually. PP's 1.5–2.0% shrinkage and 0.90 g/cm³ density require mold cooling strategies optimized for uniform part density and dimensional stability. Baseline scope covers molds with stripper-plate ejection, center hot-tip gating, and estimated cycle times 6–9 seconds. Regional benchmark includes Vietnam (fastest lead-time, cost-competitive), Thailand (mid-range lead-time, quality-focused), and Indonesia (emerging capacity, variable quality). Exclusions: chrome plating upgrades, family molds, and multi-material inserts quoted separately.