Baseline Definition and Benchmark Scope
PP checkout-basket molds in Southeast Asia target 1.5β4 mm wall thickness with cavity tolerances Β±0.1β0.15 mm accounting for PP's 1.5β2.0% shrinkage. Standard basket volumes range 20β50 liters. Mold steel grade (P20/NAK80) and cooling-circuit design directly impact cycle times; typical cycles run 45β75 seconds depending on wall geometry and basket ribbing. Baseline scope covers mold fabrication lead-time (8β14 weeks), first-article inspection (FAI) protocols, and post-mold commissioning trials. PP's excellent chemical resistance to acids and bases supports food/retail applications; however, UV stabilizer inclusion adds 2β4% material cost. Benchmarks exclude secondary operations (deburring, assembly) and assume standard cavity counts (2β4 cavities per mold).