Baseline Definition and Benchmark Scope
This benchmark covers single- and multi-cavity checkout basket molds in unfilled PP for European injection molders. Scope includes mold cost, material cost at $0.90β1.10/kg, cycle time 7β10 seconds, and cavitation density (1β4 cavities). Baseline assumes 40β80 g part weight per basket unit, wall thickness 1.5β3 mm per PP design rules, and standard stripper-ring ejection systems. Regional scope spans EU27 plus UK, with lead-time baselines from 10β14 weeks for tooling. Quality KPIs include dimensional tolerance Β±0.3%, shrinkage compensation within Β±0.2%, and surface finish Ra 0.8β1.6 Β΅m. Excludes post-molding operations, chrome plating, and hot-tip gating add-ons unless explicitly quoted.