Plastic Armchair Mould
Chair Mould

Plastic Armchair Mould

Premium plastic armchair mould with integrated armrests for enhanced comfort. Gas-assist injection technology ensures lightweight yet strong chairs. Perfect for cafes, gardens, and residential use.

Cycle Time

55-65 seconds

Mould Life

400,000+ shots

Material

PP

Key Features

  • Gas-assist injection technology
  • Integrated armrests
  • Ergonomic backrest curve
  • Stackable design
  • Multiple color options
WhatsApp Us

Technical Specifications

Product Size560 x 520 x 820 mm
Mould Size950 x 850 x 1000 mm
Cavity1 cavity
Steel718H / S136
Hardness30-34 HRC
Runner SystemHot Runner + Gas Assist
EjectionHydraulic + Air Assist

Applications

Gardens
Cafes
Balconies
Waiting Areas

Comfort Meets Manufacturing Excellence

Armchairs represent the premium segment of plastic seating. Our gas-assist technology enables manufacturers to produce chairs that rival wooden furniture in comfort while maintaining plastic's cost advantages.

Mediterranean Resort Chain Project

A Greek hotel group furnishing 50 properties needed outdoor armchairs that:

  • Matched their Mediterranean aesthetic
  • Survived coastal salt air conditions
  • Provided genuine comfort for extended sitting
Our solution combined ergonomic design with marine-grade material specifications.

Results:
  • 98% guest satisfaction rating for outdoor seating
  • Zero chair replacements in 3 years of coastal exposure
  • 30% weight reduction vs. previous supplier (logistics savings)

The Comfort Engineering Difference

Armchairs must balance multiple comfort factors:

FactorImpact on ComfortOur Solution
Seat anglePrimary5° backward tilt
Armrest heightCriticalErgonomic 250mm from seat
Backrest curveImportant15° lumbar support angle
FlexibilityComfort feelGas channels for controlled flex

Applications Beyond Hospitality

Our armchair moulds serve diverse markets:

  • Cafes and restaurants: Stackable for space efficiency
  • Garden and patio: UV-resistant formulations
  • Waiting areas: Commercial-grade durability
  • Residential: Premium appearance at accessible price

Gas-Assist Injection: The Technology Behind Premium Chairs

Understanding Gas-Assist Injection

Gas-assist injection moulding (GAIM) revolutionizes furniture production:

Process Comparison

AspectConventionalGas-Assist
Wall thickness4-5mm uniform2-3mm + hollow sections
Part weight3.5kg2.5kg (-30%)
Cycle time70s55-65s
Sink marksCommonEliminated

Gas Channel Design

Strategic gas channel placement creates structural hollow sections:

Channel Locations

  • Armrests: Primary gas channels, 60% hollow
  • Seat frame perimeter: Structural rigidity
  • Backrest ribs: Controlled flexibility

Channel Specifications

  • Entry diameter: 25mm
  • Taper ratio: 5% reduction per 100mm
  • Minimum wall: 3mm around gas channel

Structural Analysis

Despite weight reduction, gas-assist chairs exceed conventional chair strength:

TestConventional ChairGas-Assist Chair
Static load150kg150kg
Fatigue (100,000 cycles)Minor deformationNo deformation
Impact (drop test)Surface damageNo damage
The hollow sections act as shock absorbers.

Armrest Integration Challenges

Integrated armrests require careful engineering:

  • Undercut management: Sliding cores for armrest geometry
  • Weld line placement: Hidden under armrest
  • Strength testing: 50kg vertical load on each armrest

Mould Complexity Considerations

Gas-assist furniture moulds are complex:

  • 4 sliding cores (2 per armrest)
  • Gas injection system integration
  • Extended cooling for thick sections
  • Hydraulic ejection with air assist

Why Choose Our Plastic Armchair Mould

30% weight reduction through gas-assist technology

Ergonomic design with 5° seat tilt and lumbar support

6-8 chair stacking capability

50kg armrest load capacity each side

Frequently Asked Questions

Common questions about our Plastic Armchair Mould

What is the weight difference with gas-assist technology?

Gas-assist reduces chair weight by approximately 30% (from 3.5kg to 2.5kg typical). This reduces material cost, shipping cost, and makes chairs easier for end-users to move.

How many armchairs can be stacked?

Our design allows 6-8 armchairs to be stacked safely. The armrest geometry is designed to nest without damage. Stack height is approximately 700mm for 6 chairs.

Is gas-assist equipment required at the production facility?

Yes, gas-assist injection requires a nitrogen gas system integrated with the injection machine. Most modern facilities have this capability. We can recommend equipment suppliers if needed.

What is the minimum order for custom colors?

The mould accommodates any color masterbatch. Minimum order for custom colors is typically 3,000-5,000 chairs depending on your production partner's requirements.

Can metal inserts be added for commercial durability?

Yes, we can design the mould to accommodate metal leg inserts for commercial/contract applications. This increases load capacity to 200kg+ and extends chair life significantly.

What is the UV resistance for outdoor use?

With UV-stabilized PP and appropriate masterbatch, our armchairs maintain color and strength for 5+ years of outdoor exposure. We recommend specific UV stabilizer levels based on your geographic market.