RFP Objective and Business Context
Establish single-source HDPE injection mold for retail stackable crates with wall thickness 2β5 mm and cycle-time targets aligned to production volume. HDPE's density range (0.94β0.97 g/cmΒ³) and flexural modulus (0.8β1.5 GPa) enable nesting and stacking under load without creep or brittleness at ambient and refrigerated temperatures. Define mold cavity count, gate design for thin-wall fill, and cooling-circuit specifications to achieve melt-temperature window (180β230Β°C) without gate freeze-off or jetting. Establish shrinkage tolerance band (2.0β3.0%) to control crate dimensional stability across stackability interfaces. Single-source commitment requires supplier financial stability audit, tooling escrow terms, and design-change governance.